HISTORY
timeline
1962 – Original Construction by Vosper Ltd in Portchester UK
1979 to 1989 – Major Restoration at Ocean Quay in Southampton UK
2017 – 2021 – Major External Refit at Trafalgar Shipyard in Portchester UK
1958 (Keel laid) to 1962
Original construction based on the hull form and machinery layout of the Vosper 'Brave Class' Fast Patrol Boats.
2017 TO 2021
Complete refit of outside including hull and superstructure repairs, epoxy/glass sheathing of topsides, new paint and varnish throughout.
Full preparation for upcoming Stage 2 refit of engineering, electrical and navigation systems.
1979 to 1989
Major restoration of hull, superstructure, electrical systems, navigation and machinery.
Addition of the manoeuvring engines and bridge.